the shafts from my current build are coming from Jesse at High Angle Driveline. my front shaft alone is going to be almost $800, but it is a 2 piece model, with stainless pillow block / carrier bearing, double slip, 1410 u-joints and rockwell flanges included. That's 3" tubing with a .25 wall as well. Serious beef. The rear is a standard, non-cv with 1410's and rockwell flange included, and it's about $300 or so.
I'm having him make my first set, then i will have the parts to make future ones if needed. With the time and energy i'm spending on this, it's just a little peace of mind that my shaft will be super sold and good to go.
Jesse is the man.
|