View Single Post
Old 03-18-2007, 10:42 AM   #9
JeffK5
Tiny Member
 
JeffK5's Avatar
 
Join Date: Jan 2007
Location: Colerain
Posts: 798
"How about clearancing just two side of the tube instead of turning the whole thing down...? That would leave your .500 wall on two edges and at least 3/8 or so on your weld edge... If i had thought about it, this is what i would have done. Not sure why i didnt think of it"


This is what I meant by "slab", great minds think alike..


I had planed on taper milling them so the flat faded to nothing as it went away from the weld joint , would look sweet and leave max. metal.

I was going to build some temp. tooling at work to smash the tube , I wasn't worried about inconsistency just weakening it.

Mike, I might like to buy a small piece (10"-12") of 2x.5 scrap off you and test this idea. We have a full metallurgical lab at my shop and I could get our tech to check and see what kind of damage is done by crushing it. I know it's overkill and don't mean shi+ to my build but I'm kinda' interisted in knowing what impact bending has on tube.

Jeff
JeffK5 is offline   Reply With Quote