Quote:
Originally Posted by Drivermod
I envision one truck, one trailer, and lots of loading and unloading on the road out in front of the park. Easy work around.
|
No thank you. At least five or ten minutes to load, and then to unload, and to drive back and forth, half hour per rig. You'd spend two hours trying to "sneak" four rigs in, and two more hours sneaking them back out.
To say nothing of the reaction if/when the zoning board caught on.
No, for now anyway, this park is for the quads and tube buggies. Shame, but that's that.
Robert