![]() |
#17 |
pimpin' IS easy
|
Well, I'm about 3/4 done welding the chassis. Would be done, but had to pause to add some more bracing on the lower link mounts. It's funny, didn't think at all about them being weak until i had it all tore down and was looking at it.
Sucked, cuz i had to do some recalling and picture searching to see what kind of bracing i could put where. It's like 10 gallons of **** in a 5 gallon bucket under there. Can't imagine building a smaller narrower rig.... where does everything go? Here are some shots of it before i started welding it, i thought it looked pretty cool. Also, i wish i had finish welded some parts of it before moving on, as there are quite a few spots that are really hard to get to know... Some of my welds are starting to look mediocre as well, pusing 4-6 hours at a time probably isnt smart. ![]() ![]() ![]() And it's bizzarre how much more space a rig takes up when it is disassembled. I can't even move inside the shop now. ![]() ![]() And here are a couple shots of of the extra bracing i put on the link mounts. I hope it holds, it's about the best i can do with the space i am given. the front only has the vertical brace on one side, as the other side has the pillow block mount. Cross your fingers. ![]() ![]() ![]() ![]() ![]() Should be done welding this week, and possibly in paint as early as next weekend. having it done electrostatic...
__________________
|
![]() |
![]() |
|
|