04-24-2010, 11:15 PM | #1 |
Join Date: Mar 2008
Posts: 188
|
It's done
finally after 3 months and a complete frame up she is going out tomorrow for her 1st shakedown run
__________________
95 yj, fresh fuel injected 302, c-6, twin sticked 205, 3 linked high pinion d60 front, double trianulated 4 linked 14 bolt rear (all aluminum links) locked both ends, 4:56 gears, full hydro steering, high steer, 4 wheel discs, 16" 2.5 fox air shocks, 39.5" irok's. just finishing a full frame-up redo thanks to a great friend and one knowledgable(sp?) s.o.b casey cravens for without him this could not have been done in such a short time and done right! LOOK OUT "WHITEY" HERE I COME!!! Last edited by boomhauer; 04-24-2010 at 11:30 PM. |
|
|